(A) G99/2 Training

$50.00

Category:

Description

Engineering Recommendation G99, Issue 2Connecting Power Generating Modules to DNO Distribution NetworksThis module assumes you already hold core electrical engineering fluency — impedance, power factor, fault levels, per-unit systems. We won’t re-teach those. What we will do is go deep on what G99/2 actually requires, in the terms a DNO connections engineer or consultant needs to defend a design or an application.G99/2 governs any Power Generating Module (PGM) — synchronous, inverter-connected, storage, or Vehicle-to-Grid — operating in parallel with a GB distribution network from 27 April 2019 onward, where it isn’t already covered by G98 (the <16 A/phase micro-generation standard). It replaced G59/G75/G77/G83 collectively and is derived in part from the EU Requirements for Generators (RfG) Code.