(A) G5/5 Harmonics, Your Starting Point.

$50.00

Category:

Description

Engineering Recommendation G5 Issue 5 2020 Harmonic voltage distortion and the connection of harmonic sources, and/or resonant plant to transmission systems and distribution networks in the United KingdomThe new G5-5 recommendations on harmonic disturbance are a significant change to the previous G5-4. Importantly, this is a site standard rather than a product standard. This means system integrators and end-users must ensure compliance or risk withdrawal of supply by their utility company.In a power system, most equipment not drawing current in a linear way will create harmonics. This category includes variable speed drives and of course DC to AC inverters. Harmonic disturbance changes the current and voltage waveforms causing possible disruption to electronic controllers and overheating in switchgear. In extreme cases, it can also result in the failure of connected equipment.Moreover, the harmonic disruption can radiate from a company’s location to other nearby sites that share the power grid. This effect may need special consideration in the design of an electric system to serve non-linear loads.We must also be aware that there is an international standard for harmonic control in power systems and this is IEC 61000, but now that the engineering recommendation G5-5 has been updated it is much more in line with the IEC 61000-3-6, IEC 61000-4-30 and IEC 61000-4-7, so it’s very unlikely that any DNO Engineer will ever bring up this standard in conversations regarding G5-5.SCOPE OF G5-5G5-5 applies to new sites and modifications to existing sites. It also includes new planning levels and compatibility of harmonic distortion. Planning levels represent a site’s probability of disturbance, and the compatibility level is the point where equipment failures can occur. The network operator specifies voltage distortion likely to affect connected equipment based on a percentage of total harmonic distortion (THD).G5-5 also includes a headroom calculation for further supply distortion above the background levels, but below peak permitted planning levels. The amount of distortion already generated by other users on the network impacts the headroom value allowed by the operator. Medium-sized sites with their transformer have some further allowance compared to the previous G5-4 recommendations. The level of harmonic current permitted depends on the calculated harmonic voltage distortion for a supply and fault level.A key point is there is no compliance assessment of individual items of equipment to G5-5. It is a site standard, and the assessment is significantly more detailed than its predecessor G5-4.And there is a lot of discretion given to the DNO Engineer when it comes to statements like the probability of disturbance, this is totally open ended, as is another area of contention within G5-5 and that is headroom, these areas of concern to any developer are ambiguous, and are not covered in the terms and definitions, but you still need to read them.!

Reviews

There are no reviews yet.

Be the first to review “(A) G5/5 Harmonics, Your Starting Point.”

Your email address will not be published. Required fields are marked *